Practical Example of Table Cart Driven Installation

Summary of Material Coiling :
       
The detector is installed on the position moving along with coiling table cart, when the material is to be coiled, the snake movement is completely controlled as to secure a smooth edge of the material after the coiling.

Summary of Material Operation :
       
The detector is installed on the position which is most close to the material placing table cart while separated from the material placing material, the snake movement coming out of the material will completely controlled by the checking position while the material which was to deviate from the original direction, by the modification driven by the oil pressure cylinder, shall go exactly along the direction set by you.